Letting the Light Back In — Highlands Nature Center Renewal

Highlands Biological Station · Western Carolina University

Letting the
Light Back In

A careful renewal of the Highlands Nature Center — new windows, weathertight walls, and a few quiet acts of conservation — so the building can keep drawing the curious into the southern Blue Ridge for generations to come.

SCO Project 24-27935-01A · 930 Horse Cove Road, Highlands, NC

Explore the renewal

The project

Renewing a building people love

For generations, the Highlands Nature Center has welcomed schoolchildren, hikers, and curious neighbors — its long ribbon of windows opening onto the gardens and the forest beyond.

Time and weather have worn the original windows and the walls that hold them. This project rebuilds that weathered edge: replacing tired windows and framing, sealing the building against rain, and doing it all with an eye toward the birds, the water, and the wood that make this place what it is.

The Nature Center is the public face of the Highlands Biological Station, a field research and teaching center that has studied the southern Blue Ridge since 1927. The work is led by Western Carolina University, with design and engineering by Terracon.

Steward
Highlands Biological Station
Design & engineering
Terracon
Place
Highlands, North Carolina
Status
Approved · begins August 2026
The project cover sheet for the Highlands Nature Center Structural Repairs, including the vicinity map and scope-of-work summary.
From the drawings · G0.01 · Cover sheet⤢ Click to enlarge

Explore the work

Point to the building

Five kinds of care, mapped onto the Nature Center itself. Hover or tap a marker to see what's being renewed.

Base project Planned enhancement — an add-on option in the project bid
excavate · waterproof · drain to the stormwater garden
The architect's elevations of the Nature Center — south, north, west, and east faces — showing the stone walls, the ribbon of storefront windows, timber columns, and the standing-seam roof.
The real thing · BE2.01 · Elevations⤢ Click to enlarge

The work, up close

What's being renewed, and why it matters

The same five threads, told in full — from the glass at the front to the drain hidden beneath your feet.

01 / 05 Glass & light
Base project

New windows and entrances

The Nature Center's best feature is its wall of glass — the way the forest seems to step right into the room. But the original windows and the doors beside them have reached the end of their lives, and the wood framing behind them has weathered.

Crews will take the old windows, entrances, and framing out and set new aluminum-framed storefront in their place, tuned to hold the weather at bay and the warmth inside. The new doors open and swing just like the ones you remember, so the building feels like itself the day it reopens.

Construction details for the new windows — sill, jamb, and head — showing the aluminum storefront, sealant and flashing membrane, and salvaged-chestnut interior trim.
From the drawings · BE5.01 · Window details⤢ Click to enlarge
02 / 05 Safe passage
Planned enhancement

Bird-friendly glass

A building that celebrates the forest shouldn't be dangerous to the things that live in it. Across the country, glass collisions kill hundreds of millions of birds every year — they simply don't see it.

The new panes can carry a faint etched pattern, all but invisible to us but clear enough to a warbler or a thrush that it reads the glass as a wall and flies around. It's a small change with an outsized kindness.

03 / 05 Managing water
Planned enhancement

Waterproofing and drainage

Out of sight, this is some of the most important work. Crews dig several feet down along the foundation to give the building a modern waterproof skin, then lay a French drain — a bed of gravel and perforated pipe that gathers groundwater before it can reach the basement.

Rather than sending that water to the storm sewer, the system routes it to the Station's existing stormwater garden, where it soaks back into the ground. A drier building, and not a drop wasted.

The main-level and roof plans, showing new trench and area drains and the routing of stormwater toward the existing stormwater garden.
From the drawings · BE1.01 · Floor & roof plans⤢ Click to enlarge
04 / 05 Reclaimed wood
Base project

A second life for chestnut

Some of the building's original columns are chestnut — wood from a tree that once ruled these ridges before an imported blight erased it a century ago, and one that's been treasured ever since.

Rather than haul those columns to a dumpster, they'll be carefully milled and returned to the building as interior trim. A little of the old Appalachian forest, kept inside the walls.

05 / 05 Sealing the envelope
Base project

The weather skin

Around the roofline, new metal fascia and flashing tie the standing-seam roof to the freshly rebuilt walls, closing the seams where rain used to work its way in.

Behind the finishes, a continuous air barrier wraps the building like a windbreaker — quietly cutting drafts and trimming the energy it takes to keep the place comfortable through a Highlands winter.

Wall sections through the roof edge, showing the standing-seam metal roof, rigid insulation, new metal fascia, and the window head below.
From the drawings · BE3.01 · Wall sections⤢ Click to enlarge

Built with care

The way a nature center should be

For the birds

Etched glass a bird can see and steer around.

For the water

Drainage that feeds the stormwater garden, not the sewer.

For the forest

Historic chestnut, milled and kept in the building.

What to expect

How the work unfolds

The plans are final and permitted. Construction begins in August 2026, unfolding in five phases.

Phase 01

Design and documents

Terracon's construction drawings were issued in December 2025 and are now final and approved — every window, drain, and detail mapped before a single tool is lifted.

Phase 02

Site preparation

Beginning August 2026: protecting the grounds, staging materials, and readying the building — the quiet groundwork that keeps everything after it running smoothly.

Phase 03

Windows and framing

The old ribbon of windows and its weathered framing come out; new storefront and structure go in, restoring the building's edge.

Phase 04

Weatherproofing and drainage

Sealing the foundation and laying the new French drain, routed out to the stormwater garden where the water belongs.

Phase 05

Finishes and reopening

Milled chestnut trim, paint, and the final details — and then the doors open onto the forest once more.

The hands-on work is in the care of RYSE Construction of Mills River, led by Hunter Gant — the crew you'll see on site turning these drawings into a renewed building.

The details

Project ledger

Project
HBS Nature Center Structural Repairs
SCO number
24-27935-01A
Steward
Highlands Biological Station · Western Carolina University
Design & engineering
Terracon · Charlotte, North Carolina
General contractor
RYSE Construction · Mills River, North Carolina
Location
930 Horse Cove Road, Highlands, North Carolina 28741
Documents issued
December 2025

In closing

A place worth keeping

The Highlands Nature Center has drawn the curious into these mountains for generations. This work makes sure it can keep doing so — brighter, drier, and a little kinder to the wild things just outside the glass.

Visit the Highlands Biological Station
Highlands Biological Station Western Carolina University · 2026

Illustration is schematic and simplified for clarity; refer to the stamped construction documents for actual dimensions, materials, and details. Bird-friendly glazing and foundation waterproofing are bid alternates that may be included in the final scope.