By 1988, inspections revealed drainage concerns. In 1997, the dam was fully replaced to meet federal standards.
The lake was drained. Rhododendrons cleared. Modern engineering replaced aging earthworks — ensuring the lake’s endurance.
Exhibit Caption:
Heritage secured by engineering.
Recent Comments