By 1988, inspections revealed drainage concerns. In 1997, the dam was fully replaced to meet federal standards.

The lake was drained. Rhododendrons cleared. Modern engineering replaced aging earthworks — ensuring the lake’s endurance.

Exhibit Caption:
Heritage secured by engineering.